Research on the bearing capability of the middle tower caisson foundation of Taizhou bridge
|
Bibliographic Details
Author(s): |
Jing Ruan
Zhaoxiang Feng Guojian Shao |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012 | ||||
Published in: | IABSE Congress Seoul 2012 | ||||
|
|||||
Page(s): | 1365-1370 | ||||
Total no. of pages: | 6 | ||||
DOI: | 10.2749/222137912805111870 | ||||
Abstract: |
An caisson was adopted for the middle tower foundation of Taizhou Bridge. The shallow foundation calculation formula commonly used by chinese designer is not applicable for the middle tower foundation located above the 200-meter overlying deposit in the water. Model test and 3D numerical simulation analysis are simultaneously conducted for Taizhou Bridge, to obtain the foundation soil bearing capacity of the open caisson foundation of the middle tower and ensure the structural safety and stability. |
||||
Keywords: |
numerical simulation model test bearing capability of caisson the overlying deposit
|