0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Research on the bearing capability of the middle tower caisson foundation of Taizhou bridge

 Research on the bearing capability of the middle tower caisson foundation of Taizhou bridge
Author(s): , ,
Presented at 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012, published in , pp. 1365-1370
DOI: 10.2749/222137912805111870
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.2 MB

An caisson was adopted for the middle tower foundation of Taizhou Bridge. The shallow foundation calculation formula commonly used by chinese designer is not applicable for the middle tower foundat...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: 18th IABSE Congress: Innovative Infrastructures – Towards Human Urbanism, Seoul, Korea, 19-21 September 2012
Published in:
Page(s): 1365-1370 Total no. of pages: 6
Page(s): 1365-1370
Total no. of pages: 6
DOI: 10.2749/222137912805111870
Abstract:

An caisson was adopted for the middle tower foundation of Taizhou Bridge. The shallow foundation calculation formula commonly used by chinese designer is not applicable for the middle tower foundation located above the 200-meter overlying deposit in the water. Model test and 3D numerical simulation analysis are simultaneously conducted for Taizhou Bridge, to obtain the foundation soil bearing capacity of the open caisson foundation of the middle tower and ensure the structural safety and stability.

Keywords:
numerical simulation model test bearing capability of caisson the overlying deposit

Structures and Projects