0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Repair and strengthening of the Blagnac bridge in Toulouse

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Extending the Lifespan of Structures, San Francisco, CA, USA, August 1995
Published in:
Page(s): 1473-1478
Year: 1995
DOI: 10.5169/seals-55378
Abstract: The three-span bridge, prestressed concrete box beam constructed by the balanced cantilever method, presents insufficiences in the longitudinal prestressing and in the transversal passive reinforcement. Mainly in the central span, this insufficiency was evidenced as peripheral cracking of the bottom slab around the continuous prestressing zone. The repair has consisted in adding longitudinal prestressing and in removing the cracked zone.

Structures and Projects

Structure Types

Geographic Locations

Structurae cannot make the full text of this publication available at this time. The full text can be accessed through the publisher via the DOI: 10.5169/seals-55378.
  • About this
    data sheet
  • Reference-ID
    10023442
  • Published on:
    13/07/2006
  • Last updated on:
    20/02/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine