0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Renewal of Railway Steel Bridges by Integration with Concrete Slab

 Renewal of Railway Steel Bridges by Integration with Concrete Slab
Author(s): , ,
Presented at IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009, published in , pp. 122-129
DOI: 10.2749/222137809796088378
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.04 MB

Railway steel bridges, which exceed their design lifetime, are increasing in Japan and some of them have problems such as corrosion, fatigue and noise. In this study, we proposed a method to improv...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009
Published in:
Page(s): 122-129 Total no. of pages: 6
Page(s): 122-129
Total no. of pages: 6
Year: 2009
DOI: 10.2749/222137809796088378
Abstract:

Railway steel bridges, which exceed their design lifetime, are increasing in Japan and some of them have problems such as corrosion, fatigue and noise. In this study, we proposed a method to improve a structural system of the steel bridges by integration with concrete decks. This method improves the load-carrying capacity of the girders, extends the service life, and reduces the noise. This paper describes the proposed method of concrete deck installation, connection between steel girders and concrete decks, and loading tests of girder-deck connection.

Keywords:
existing steel railroad bridges structure improvement integration with concrete decks