Reinforcement of Felix Houphouët-Boigny bridge in Abidjan

 Reinforcement of Felix Houphouët-Boigny bridge in Abidjan
Author(s): , , , ,
Presented at IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, published in , pp. S21-61
DOI: 10.2749/nantes.2018.s21-61
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.37 MB

Felix Houphouët-Boigny bridge in Abidjan is a twin double deck bridge (Road up / Rail down), crossing the Ebrié laguna, 372 lm long with 2 x 8 x 46.5 lm spans, built in 1956. Further to the sliding...
Read more

Bibliographic Details

Author(s): (Eiffage Infrastructures, Vélizy-Villacoublay, France)
(Eiffage Infrastructures, Vélizy-Villacoublay, France)
(Spie Fondations, Cergy-Pontoise, France)
(Egis JMI, Guyancourt, France)
(Egis JMI, Guyancourt, France)
(Egis JMI, Guyancourt, France)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Published in:
Page(s): S21-61 Total no. of pages: 10
Page(s): S21-61
Total no. of pages: 10
DOI: 10.2749/nantes.2018.s21-61
Abstract:

Felix Houphouët-Boigny bridge in Abidjan is a twin double deck bridge (Road up / Rail down), crossing the Ebrié laguna, 372 lm long with 2 x 8 x 46.5 lm spans, built in 1956. Further to the sliding of a layer of sand that induced horizontal efforts, significant cracking occurred on the piles that worsened over time. Moreover, the concrete of the piers has been gradually deteriorated due to the salty laguna environment and the deck has suffered the effects of aging. The solution of reinforcement consists in creating new piles next to the existing ones, which will support “transfer beams” built under the existing deck, at each end of each span. Afterwards the weight of the deck is transferred on the new beams and the new piles through a combination of jacking and grouted pot bearings. In addition, the deck will be reinforced using a combination of well-known techniques.

Keywords:
double deck post-tensioning bored piles Maritime works jet grouting additional prestressing