Rehabilitation of Monte Carlo Star’s piers
|
Bibliographic Details
Author(s): |
Naziha Berramdane
Erik Mellier Christian Tourneur |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009 | ||||
Published in: | IABSE Symposium Bangkok 2009 | ||||
|
|||||
Page(s): | 154-160 | ||||
Total no. of pages: | 6 | ||||
Year: | 2009 | ||||
DOI: | 10.2749/222137809796078612 | ||||
Abstract: |
The rehabilitation of piers of Monte Carlo Star building was performed using Foreva Solution. It required two electrochemicals techniques in addition to traditional repair: a temporary electrochemical treatment for extracting the chlorides “Foreva Regebeton PA” and a permanent cathodic protection with impressed current “Foreva CP Mesh”. This paper will explain in detail the electrochemical principles of the treatment, the design of cathodic protection the 17 piers, the way it is set up on site, the way it works, and the results that were obtained. |
||||
Keywords: |
reinforced concrete cathodic protection corrosion chloride extraction
|