0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Refurbishment of orthotropic steel bridge decks by bolted solutions

 Refurbishment of orthotropic steel bridge decks by bolted solutions
Author(s): ,
Presented at IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, published in , pp. 1111-1115
DOI: 10.2749/newyork.2019.1111
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.18 MB

An increasing number of steel road bridges in Germany, but also in Europe and North America, show severe fatigue damages induced by the increase in heavy traffic loads. In addition, these road brid...
Read more

Bibliographic Details

Author(s): (Institute of Structural Design, University of Stuttgart)
(Institute of Structural Design, University of Stuttgart)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Published in:
Page(s): 1111-1115 Total no. of pages: 5
Page(s): 1111-1115
Total no. of pages: 5
DOI: 10.2749/newyork.2019.1111
Abstract:

An increasing number of steel road bridges in Germany, but also in Europe and North America, show severe fatigue damages induced by the increase in heavy traffic loads. In addition, these road bridges from the 1960s to the 1980s were executed with fatigue-critical details, which are no longer state of the art today. Longitudi- nal stiffeners of orthotropic steel bridge decks, fitted between the cross girders are an example. Due to the particular importance of these bridges, e.g. crossing the Rhine, for the regional infrastructure network, the refurbishment has to be realized under consideration of the running traffic. Thus, refurbishment solutions are needed that are robust and durable with the least possible intervention in the current traffic. Bolted bearing- type shear connections are particularly suitable in this context, as they can usually be classified in higher fa- tigue detail categories than welds. However, for longitudinal stiffeners with a closed cross section such as a Y- shape or a trough shape normal bolting is not applicable. Therefore, the development of a refurbishment solution using mechanical fasteners and considering the only one-sided accessibility of stiffeners with a closed section by the use of blind rivets was the focus of two German research projects [1], [2]. In this paper, this innovative refurbishment solution by means of mechanical fasteners including blind rivets is presented. Fa- tigue tests on large-scale components consisting of longitudinal stiffeners butted up to a cross girder web with and without repair measure as well as small size fatigue tests on blind rivets were realized. First results of the currently still ongoing research [1] are presented.

Keywords:
fatigue assessment refurbishment technique orthotropic steel bridge decks blind rivets