0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Re-thinking traditional construction processes: Accelerated channel construction

 Re-thinking traditional construction processes: Accelerated channel construction
Author(s): , ,
Presented at IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017, published in , pp. 239-246
DOI: 10.2749/222137817821232270
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.11 MB

For the first time in Zurich, rectangular precast concrete elements were used for constructing man size sewers in open trenches by realising the projects “Riedtlistrasse” and “Moränenstrasse”. Than...
Read more

Bibliographic Details

Author(s): (Institute of Structural Engineering, ETH Zurich, Switzerland)
(Institute of Structural Engineering, ETH Zurich, Switzerland)
(DSE systems AG, Maseltrangen, Switzerland)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017
Published in:
Page(s): 239-246 Total no. of pages: 8
Page(s): 239-246
Total no. of pages: 8
Year: 2017
DOI: 10.2749/222137817821232270
Abstract:

For the first time in Zurich, rectangular precast concrete elements were used for constructing man size sewers in open trenches by realising the projects “Riedtlistrasse” and “Moränenstrasse”. Thanks to an innovative mounting system developed by DSE systems, the precise mounting of one element took no longer than 15 minutes on a previously prepared lean concrete surface. Thus, the use of precast elements allowed a substantial reduction of construction time in comparison to the traditionally built sewers with cast in-place concrete. The concept of the construction process was developed at an early project state in creative and innovative teams consisting of engineers, precast contractor, and owner/ client. Working together at such an early stage of the project was crucial for finding innovative solutions that fit all requirements. These innovative solutions enabled the setting of new milestones in Zurich sewer construction.

Keywords:
precast elements sewer construction mounting system