Raising Existing Bridges to a Higher Navigable Clearance
|
Bibliographic Details
Author(s): |
Ryszard A. Daniel
Bas van Sinten |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Sustainable Infrastructure - Environment Friendly, Safe and Resource Efficient, Bangkok, Thailand, 9-11 September 2009 | ||||
Published in: | IABSE Symposium Bangkok 2009 | ||||
|
|||||
Page(s): | 1-10 | ||||
Total no. of pages: | 8 | ||||
Year: | 2009 | ||||
DOI: | 10.2749/222137809796088918 | ||||
Abstract: |
To improve the navigation on the Juliana Canal, a waterway from the Netherlands to Belgium and France, two bridge crossings had to be raised by over 3.0 m. The raising project required a thorough consideration to the condition of all sub- and superstructures, their behaviour during raising and in raised positions, remaining service life etc. This paper presents the highlights of the project. |
||||
Keywords: |
elevation jacking system jacking Inland navigation navigable clearance head room structure raising bridge raising jacking point pillar elevation
|