Preliminary Design of Four Optional Long Bridge Solutions for the Western Scheldt Crossing, Netherlands
|
Bibliographic Details
Author(s): |
Ryszard A. Daniel
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013 | ||||
Published in: | IABSE Symposium Kolkata 2013 | ||||
|
|||||
Page(s): | 1-8 | ||||
Total no. of pages: | 8 | ||||
Year: | 2013 | ||||
DOI: | 10.2749/222137813808626858 | ||||
Abstract: |
Two structural systems dominate the choice of a very long span bridge nowadays – the suspension and cable-stayed bridge, both with one or more main spans and in steel or concrete version. Yet, the combination of these possibilities leaves the designer with quite many options. The question which option represents the best choice has been studied in details as part of the Western Scheldt Crossing project in the Netherlands. This paper presents the conclusions of that study and the comparative conceptual designs of four final bridge options. The results can be indicative for prospective studies on long span bridge crossings in other projects. |
||||
Keywords: |
cable-stayed bridge suspension bridge pylon suspension cable anchor block multiple span Long Span Bridge bridge girder navigable clearance
|