0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Predicting project performance using pre-construction performance indicators–a case study evaluation

 Predicting project performance using pre-construction performance indicators–a case study evaluation
Author(s): , ORCID,
Presented at IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019, published in , pp. 1437-1442
DOI: 10.2749/newyork.2019.1437
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.15 MB

Predicting the outcome of a construction project largely relies on estimated targets of time and cost. Still, hitting the targets does not mean that the project is a success on all performance leve...
Read more

Bibliographic Details

Author(s): (WSP, Bridge & Hydraulic Design)
ORCID (Chalmers University of Technology)
(NCC AB)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: The Evolving Metropolis, New York, NY, USA, 4-6 September 2019
Published in:
Page(s): 1437-1442 Total no. of pages: 6
Page(s): 1437-1442
Total no. of pages: 6
DOI: 10.2749/newyork.2019.1437
Abstract:

Predicting the outcome of a construction project largely relies on estimated targets of time and cost. Still, hitting the targets does not mean that the project is a success on all performance levels. Here, a retrospective case study was undertaken on a construction project identified as a successful project by the partners involved. The purpose of the study was to validate conceptual design indicators of a high-performance construction project as reported in the literature, by answering the following research questions: “What characterizes the dialogue between the different disciplines; (2) What is the dialogue about; and (3) When in the process do questions arise?” Findings indicate that the interprofessional dialogue within the project team was well established. The paper introduces a discussion that the dialogue benefited from the collaborative project environment as well as the early design intent. Further, the study also suggests that the interprofessional dialogue supported a sound project team development.

Keywords:
structural design conceptual design constructability buildability Pre-construction indicators