0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Precast PSC Segmental Girders – An overview of failures during construction based on some case studies

 Precast PSC Segmental Girders – An overview of failures during construction based on some case studies
Author(s):
Presented at IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023, published in , pp. 1414-1422
DOI: 10.2749/newdelhi.2023.1414
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 1.04 MB

Considering faster pace of development, consistent increase in the volume of traffic in developing country like India and limitation of land availability especially in built up or urban areas, late...
Read more

Bibliographic Details

Author(s): (Former Director General {Road Development). MORTH, New Delhi, India)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Engineering for Sustainable Development, New Delhi, India, 20-22 September 2023
Published in:
Page(s): 1414-1422 Total no. of pages: 9
Page(s): 1414-1422
Total no. of pages: 9
DOI: 10.2749/newdelhi.2023.1414
Abstract:

Considering faster pace of development, consistent increase in the volume of traffic in developing country like India and limitation of land availability especially in built up or urban areas, lateral expansion in transport facilities has become more challenging. Under such circumstances vertical expansion through construction of long flyover or elevated structures is most viable solution to meet the traffic demand. However, desired quality management, skilled human resources are not keeping pace to meet the requirement of rapid expansion in the field of bridge construction. Road and Railway Bridges are complex in nature w.r.to their design and construction which required a high level of knowledge expertise and experience. Hence, some failures are taking place even during construction of bridges due to some material quality issue as well as human error. Recently failures of some under construction railway and Road Bridge in India have rocked the civil engineering profession apart from public sentiment. This paper mainly covers the issues relating to risk sharing among stakeholders for different mode of Road and Bridge Construction, Role and Responsibilities of Contractor, Engineer & Client, reasons leading to failures of some Precast PSC segmental girders and few suggestive remedial measures.

Keywords:
human error vertical expansion Lateral Expansion Role and Responsibilities Risk Sharing Precast PSC Segmental Girders