Planning, Design and Construction of Cable Stayed Bridge on river Zuari in the State of Goa, India
|
Bibliographic Details
Author(s): |
Atul Bhobe
(Managing Director, TPF Engineering Pvt. Ltd. 1401, Rupa Sapphire, Plot no. 12, Sector-18, Opposite Sanpada Railway Station, Sion - Panvel Highway,Vashi, Navi Mumbai – 400705, India)
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Congress: Bridges and Structures: Connection, Integration and Harmonisation, Nanjing, People's Republic of China, 21-23 September 2022 | ||||
Published in: | IABSE Congress Nanjing 2022 | ||||
|
|||||
Page(s): | 2074 | ||||
Total no. of pages: | 1 | ||||
DOI: | 10.2749/nanjing.2022.2074 | ||||
Abstract: |
National Highway 66 (NH 66) runs North-South in the state of Goa and is the lifeline of the state. Around the centre of this highway, river Zuari runs East-West and needs to be bridged to connect North and South. The existing bridge is 2 lanes and under repair and rehabilitation for the last 2 decades and has severely reduced load carrying capacity thereby creating a long detour for heavy vehicles to traverse North-South. Besides, the local traffic of light vehicles has also increased substantially over the last 2 decades rendering this location critical for passage of traffic. There is therefore, a perennial traffic bottleneck at this location. |