0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Performance Indicators for assessing RAMS SHEEP performance

 Performance Indicators for assessing RAMS SHEEP performance
Author(s): , ,
Presented at IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, published in , pp. 320-327
DOI: 10.2749/vancouver.2017.0320
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.22 MB

Bridge management strategies need to specify maintenance actions, which are required in order to keep a desired performance level. This paper presents the structure and basic ideas for the developm...
Read more

Bibliographic Details

Author(s): (HOJ Consulting, Brunnen, Switzerland)
(TU Twente, Enschede, the Netherlands)
(Rijkswaterstaat, Utrecht, the Netherlands)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Published in:
Page(s): 320-327 Total no. of pages: 8
Page(s): 320-327
Total no. of pages: 8
Year: 2017
DOI: 10.2749/vancouver.2017.0320
Abstract:

Bridge management strategies need to specify maintenance actions, which are required in order to keep a desired performance level. This paper presents the structure and basic ideas for the development of a guideline incorporating different aspects of bridge performance goals, which may vary according to technical, environmental, economic and social factors. Furthermore it discusses the need for agencies to measure bridge performance against objectives on structure and network level. The paper is based on activities in the COST Action TU 1406, which aims to bring together both research and practicing community in order to accelerate the establishment of a European guideline for bridge management.

Keywords:
performance level bridge management strategies COST TU1406