0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The Penang Second Crossing Design and Construction

Author(s):

Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

When constructed in 1985 the Penang Bridge was, at 14 km, one of the longest sea crossings in the world, linking the island of Penang with mainland Malaysia. The structure is heavily used and was widened in 2009. A second longer crossing was proposed to relieve the first, work started on the design and construction in 2008. The second crossing is a 24 km structure mainly over sea approximately 10 km south of the first bridge. This paper outlines the project history and describes its design and construction. The project blends local materials and international techniques. The paper outlines the key design issues; the use of long spun concrete piles, span-by-span segmental viaduct construction and high-density rubber bearings used as seismic isolation devices.

Keywords:
bridges seismic isolation precast concrete marine viaducts

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065557
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine