Optimizing the construction method of a surface tunnel south of Vienna
Author(s): |
Rudolf Hörhan
Gerhard Eberl |
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | IABSE Colloquium: Tunnel structures, Stockholm, Sweden, June 1998 |
Published in: | IABSE Colloquium Stockholm 1998 |
Page(s): | 49 |
Year: | 1998 |
DOI: | 10.5169/seals-59020 |
- About this
data sheet - Reference-ID
10026934 - Published on:
15/02/2007 - Last updated on:
20/02/2021