Oosterweel link & Nijmegen City Bridge : Two examples of an integral approach to large-scale infrastructure projects in an urban context
|
Bibliographic Details
Author(s): |
Laurent Ney
Chris Poulissen Kenny Verbeeck |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Large Structures and Infrastructures for Environmentally Constrained and Urbanised Areas, Venice, Italy, 22-24 September 2010 | ||||
Published in: | IABSE Symposium Venice 2010 | ||||
|
|||||
Page(s): | 526-527 | ||||
Total no. of pages: | 8 | ||||
Year: | 2010 | ||||
DOI: | 10.2749/222137810796025690 | ||||
Abstract: |
The design and build concept is not a new concept. Since a few years this concept is also adopted for large infrastructure projects. Often the maintenance aspect is included, as is in some cases the financial aspect. This reduces for the client the financial risk, however it also requires a very specific definition of the client’s needs and wants. The Oosterweel link is a large-scale and complex infrastructure project. It consists of the closing of the Antwerp Ring (600.000 inhabitants, and 5th largest port in the world). At present not just port traffic, but especially through-going traffic between Northern and Southern Europe immobilizes the city and the surrounding towns. Estimated construction cost of the project is 2.2billion euro, is to be realized as a DBFM project, and was selected as final bidder in a 2005-2006 international tender competition, in which also Sir N. Foster and Wilkinson Eyre participated. In 2008 the Gemeente Nijmegen, the Netherlands, initiated a tender process to find a solution to a mobility problem that is slowly bringing the entire city to a halt. Here also the client chose the DBM concept for the tender process. The financing of the project is not a responsibility of the bid winner. On the contrary, for this project the total budget was a known parameter, and fixed by the Gemeente Nijmegen at 140 million euros. Several international teams competed, in February 2010 the combination BAM/Max Bogl/Ney-Poulissen Architects & Engineers was nominated winning bidder. The project mainly consists of a large span bridge over the river Waal, and 1.2km of smaller spans crossing the ‘Uiterwaarden’. In order to create a connection between the existing city center, and the planned city expansion across the river, the main goal of the tender process was to find the most qualitative “city bridge”. In this paper the impact of the Design & Build concept is discussed for the Oosterweel link project and for the City Bridge Nijmegen. |
||||
Keywords: |
structural design bridge design design & build Oosterweel link City Bridge Nijmegen
|