0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Offsite/Accelerated Construction of a Busy Interchange Bridge

 Offsite/Accelerated Construction of a Busy Interchange Bridge
Author(s): ,
Presented at 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008, published in , pp. 630-631
DOI: 10.2749/222137908796294153
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.1 MB

Parsons Brinckerhoff, Inc. is designing the replacement of a busy urban interchange structure over Interstate 4 (I-4) in the Orlando metro area for the Florida Department of Transportation (Florida...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: 17th IABSE Congress: Creating and Renewing Urban Structures – Tall Buildings, Bridges and Infrastructure, Chicago, USA, 17-19 September 2008
Published in:
Page(s): 630-631 Total no. of pages: 8
Page(s): 630-631
Total no. of pages: 8
DOI: 10.2749/222137908796294153
Abstract:

Parsons Brinckerhoff, Inc. is designing the replacement of a busy urban interchange structure over Interstate 4 (I-4) in the Orlando metro area for the Florida Department of Transportation (Florida DOT). The interchange structure carries nine lanes of traffic, and a quarter million vehicles pass through the interchange daily. PB incorporated accelerated bridge construction techniques, such as off-site construction and transportation using self-propelled modular transporters (SPMTs), in the design to reduce the construction schedule and traffic disruptions. This will be the first time these innovative techniques are used to replace a busy urban interchange structure in Florida.

Keywords:
urban accelerated bridge construction off-site self-propelled modular transporters