0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Author(s):



Medium: conference paper
Language(s): English
Conference: Footbridge 2014 - Past, Present & Future, London, 16-18 July 2014
Published in:
Year: 2014
Abstract:

Newport City Footbridge was completed in 2006. This paper describes how the design brief led to the concept design for the 145m span pedestrian bridge, which resembles cranes that occupied the former wharf site. The paper also explores the key engineering aspects of the design, including the static and dynamic analysis and later describes the fabrication and construction of the bridge, and its on-site dynamic testing. Finally, after 7 years service, the paper considers how well the bridge has succeeded in meeting its original design objectives in spearheading the regeneration of the east and west banks of the river Usk.

Keywords:
fabrication construction footbridge dynamics footbridge design dynamic testing footbridge aerodynamics

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10070955
  • Published on:
    09/12/2014
  • Last updated on:
    02/06/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine