The New Storstrøm Bridge - Construction Tolerances and Precast Structures Installation Challenges

The New Storstrøm Bridge - Construction Tolerances and Precast Structures Installation Challenges
Author(s): ,
Presented at IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022, published in , pp. 96-103
DOI: 10.2749/prague.2022.0096
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.14 MB

The construction of the Storstrøm Bridge faced and is facing a number of challenges, to ensure the alignment with design assumptions and project requirements. The main constraints related to tolera...
Read more

Bibliographic Details

Author(s): (CLO, Andermann Engineering, Denmark)
(Technical Manager, SBJV, Denmark)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Challenges for Existing and Oncoming Structures, Prague, Czech Republic, 25-27 May 2022
Published in:
Page(s): 96-103 Total no. of pages: 8
Page(s): 96-103
Total no. of pages: 8
DOI: 10.2749/prague.2022.0096
Abstract:

The construction of the Storstrøm Bridge faced and is facing a number of challenges, to ensure the alignment with design assumptions and project requirements. The main constraints related to tolerances and quality requirement are hereby described together with the strategy implemented to execute works. From the positioning of precast foundations to the erection of the girders a number of constraints pose a challenge to the general contractor (SBJV) since their fulfillment is crucial to ensure that the bridge performance standards are met, the construction program is followed and works disruption does not occur. The geotechnical settlements represent a particular challenge since the natural uncertainties related to their calculation require SBJV to adopt solutions that can accommodate any deviation from the predicted ones. In light of the above, a crucial role is played by advanced planning risk management and monitoring during construction operations.

Keywords:
settlements foundation bridge construction precast elements construction tolerances
Copyright: © 2022 International Association for Bridge and Structural Engineering (IABSE)
License:

This creative work is copyrighted material and may not be used without explicit approval by the author and/or copyright owner.

Structures and Projects