0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

New experiences with reinforced tile for Eladio Dieste when building the Cristo Obrero Church

Author(s):
Medium: conference paper
Language(s): English
Conference: 6th International Congress on Construction History (6ICCH 2018), July 9-13, 2018, Brussels, Belgium
Published in:
Page(s): 1203-1210
Year: 2018
Abstract: This paper has the aim to deep into the construction process of the three pieces that constitute the Cristo Obrero church in Estación Atlántida, Uruguay: the temple, its baptistery, and the bell tower. The paper will explore the relationship between the initial forms, conceived according to Eladio Dieste's previous industrial buildings, and the construction experiences derived from the selection of new forms under different function needs. In one hand, are the small pieces prefabricated on site with reinforced tile, like those for the roofs on the access to the baptistery and its communication with the temple, as well as the steps for the bell tower. In the other hand are the large pieces, as the curved walls and the roof of the temple. The precarious procedures and formworks to its fabrication contrast with the sophisticated structural balance of the ensemble and the tension cables inside the ceramic tile, anchored to the upper undulated beam.

Structures and Projects

Persons

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10078294
  • Published on:
    10/09/2018
  • Last updated on:
    05/03/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine