New bridge to Soto de Ribera over river Caudal, Spain
|
Bibliographic Details
Author(s): |
Guillermo Capellán
Javier Martínez Francisco Cosmen Germán Martínez |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Published in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 1911-1917 | ||||
Total no. of pages: | 7 | ||||
Year: | 2014 | ||||
DOI: | 10.2749/222137814814068436 | ||||
Abstract: |
The new access bridge to the town of Soto de Ribera over Caudal river in Asturias (Spain) is an adaptation of the concept of cable stayed bridge to a whole composite section scheme. The solution starts with a twin steel beam solution with concrete slab which has a wide spread in the world for his advantages: speeder construction, industrial quality and economy. These characteristics are the guide of the design of this cable stayed bridge. |
||||
Keywords: |
cantilever cable-stayed bridge composite bridge tower twin beam deck fork socket
|