0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Modelling of the Long Term Behaviour of Prestressed Concrete Structures: the Case of Nuclear Power Plants.

 Modelling of the Long Term Behaviour of Prestressed Concrete Structures: the Case of Nuclear Power Plants.
Author(s): ,
Presented at IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018, published in , pp. S3-77
DOI: 10.2749/nantes.2018.s3-77
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.36 MB

The prediction of the long term behaviour of prestressed concrete structures is important in order to assess and/or extend the service life of such structures. In the case of nuclear power plants (...
Read more

Bibliographic Details

Author(s): (Université Paris-Est, MAST, IFSTTAR, F-77447 Marne-la-Vallée, France)
(Université Paris-Est, Laboratoire Navier (UMR 8205), CNRS, Ecole des Ponts ParisTech, IFSTTAR, F- 77455 Marne-la-Vallée, France)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Tomorrow’s Megastructures, Nantes, France, 19-21 September 2018
Published in:
Page(s): S3-77 Total no. of pages: 8
Page(s): S3-77
Total no. of pages: 8
DOI: 10.2749/nantes.2018.s3-77
Abstract:

The prediction of the long term behaviour of prestressed concrete structures is important in order to assess and/or extend the service life of such structures. In the case of nuclear power plants (NPPs) where the internal vessel is a biaxially prestressed structure, the prediction of the delayed deformations is also a safety concern. Indeed, in these structures, the prestressing is there to avoid tensile stresses and cracking in case of a severe accident where internal pressure and temperature could be generated. An experimental mock-up of a reactor containment building at 1/3 scale has been built near Paris by EDF in order to follow the evolution of the delayed strains and of leak tightness of the containment under aging. This mock-up named VeRCoRs (VErification Réaliste du COnfinement des RéacteurS) is highly instrumented so that its behaviour is monitored from the beginning of the construction. In this paper a modelling of the delayed strains (creep and shrinkage of concrete and relaxation of steel) based on the MC2010 is used to predict the behaviour of the mock-up. This modelling takes into account the influence of the temperature and of the relative humidity (varying under service conditions). Finally, the predicted delayed strains are compared with the measurements.

Keywords:
concrete prestressing creep shrinkage relaxation long-term modelling

Structure Types