Mianyang Xishan Pteris Pool Leak and Landscape Reconstructing Project Analysis
Author(s): |
Jun Su
|
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | 2012 International Conference on Civil, Architectural and Hydraulic Engineering (ICCAHE 2012), August 10-12th 2012, Zhangjiajie (China) |
Published in: | Sustainable Cities Development and Environment [3 vols] |
Page(s): | 318-320 |
DOI: | 10.4028/www.scientific.net/AMM.209-211.318 |
Abstract: |
Due to tight deadlines and shortage of funds, Mianyang Western Hills Park of Pteris pool building fails to design perfect construction. During use,pond leakage is obvious and the landscape effect is very poor. Comparing the transformation to resolve existing problems through program optimization.In order to achieve high quality, ecological and environmentally friendly, good landscape, low-cost are integrated into one. |
- About this
data sheet - Reference-ID
10327035 - Published on:
24/07/2019 - Last updated on:
24/07/2019