Main Cable Inspection and Strength Evaluation of Helicoidal Strand Main Cables Using a Modified NCHRP Evaluation Approach

 Main Cable Inspection and Strength Evaluation of Helicoidal Strand Main Cables Using a Modified NCHRP Evaluation Approach
Author(s): ,
Presented at IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023, published in , pp. 409-416
DOI: 10.2749/istanbul.2023.0409
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.57 MB

The A. Murray MacKay Bridge (MacKay Bridge) opened to traffic in 1970 and carries four lanes of traffic over the Halifax Harbour between Dartmouth and downtown Halifax, Nova Scotia, Canada. The Bri...
Read more

Bibliographic Details

Author(s): (COWI North America Halifax, NS, Canada)
(Halifax Harbour Bridges Halifax, NS, Canada)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges, Istanbul, Turkey, 26-28 April 2023
Published in:
Page(s): 409-416 Total no. of pages: 8
Page(s): 409-416
Total no. of pages: 8
Year: 2023
DOI: 10.2749/istanbul.2023.0409
Abstract:

The A. Murray MacKay Bridge (MacKay Bridge) opened to traffic in 1970 and carries four lanes of traffic over the Halifax Harbour between Dartmouth and downtown Halifax, Nova Scotia, Canada. The Bridge's main cable has been opened for detailed visual inspections several times beginning in 2002. The Owner, Halifax Harbour Bridges, retained COWI North America to perform a strength evaluation in accordance with the National Cooperative Highway Research Program (NCHRP) Report 534– Guidelines for Inspection and Strength Evaluation of Suspension Bridge Parallel Wire Cables. As the MacKay Bridge main cable is composed of 61 parallel strands with helicoidal wires, the NCHRP 534 approach (intended for parallel wires) was modified to perform the strength evaluation for cables with helicoidal wires. Based on the analysis performed, it was determined that the main cable of the MacKay Bridge has adequate capacity at this time. Additional measures to protect the cable, mainly through dehumidification, could be considered to prevent further deterioration of the main cable and extend the service life of the cable and therefore the bridge.

Keywords:
suspension bridge cable asset management Strength Evaluation