Large Scale Infrastructure Project Implementation in Malaysia. A Case Study – Metropolitan Highways in Klang Valley: Damansara-Shah Alam Elevated Highway (DASH)

 Large Scale Infrastructure Project Implementation in Malaysia. A Case Study – Metropolitan Highways in Klang Valley: Damansara-Shah Alam Elevated Highway (DASH)
Author(s): ,
Presented at IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018, published in , pp. 685-692
DOI: 10.2749/kualalumpur.2018.0685
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.29 MB

The rapid socioeconomic development in the Klang Valley has resulted in a surge of freight and passenger transport movements and an increase in demand for better quality of roads, road networks, an...
Read more

Bibliographic Details

Author(s): (Malaysia Highway Authority.)
(Prolintas Holdings Sdn. Bhd.)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Engineering the Developing World, Kuala Lumpur, Malaysia, 25-27 April 2018
Published in:
Page(s): 685-692 Total no. of pages: 8
Page(s): 685-692
Total no. of pages: 8
DOI: 10.2749/kualalumpur.2018.0685
Abstract:

The rapid socioeconomic development in the Klang Valley has resulted in a surge of freight and passenger transport movements and an increase in demand for better quality of roads, road networks, and transport systems. Hence, the construction of the Damansara-Shah Alam Elevated Highway (DASH) project was proposed to ease traffic congestion, by efficiently dispersing the traffic coming from the surrounding townships, and by providing connectivity between the Puncak Alam catchment and the Damansara North area. The case study, namely the DASH project, will be a 16.3 km expressway traversing from Puncak Perdana in the west to Damansara Perdana in the east. The DASH project has been chosen to illustrate the various processes and challenges involved in its planning and design and in the fulfillment of its pre-construction requirements. Currently, this project is at its early stage of construction and is scheduled to be completed by August 2020.

Keywords:
project management Highway development metropolitan highway