Lagen Bridge Cables Installation and Tensioning

 Lagen Bridge Cables Installation and Tensioning
Author(s): , ,
Presented at IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016, published in , pp. 2608-2614
DOI: 10.2749/stockholm.2016.2607
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.21 MB

The Lagen Bridge is the first application of prefabricated HDPE sheathed full locked coil cable stays on a Norwegian bridge. The structure is located in Kvam, about 100 km North from Lillehammer, a...
Read more

Bibliographic Details

Author(s): (Project Manager Redaelli Tecna Milan, Italy)
(Division Manager Redaelli Tecna Milan, Italy)
(Project Manager Redaelli Tecna Milan, Italy)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016
Published in:
Page(s): 2608-2614 Total no. of pages: 7
Page(s): 2608-2614
Total no. of pages: 7
Year: 2016
DOI: 10.2749/stockholm.2016.2607
Abstract:

The Lagen Bridge is the first application of prefabricated HDPE sheathed full locked coil cable stays on a Norwegian bridge. The structure is located in Kvam, about 100 km North from Lillehammer, and it is part of the development project of route E6 between Biri and Otta. Redaelli supplied the complete set of stay cables and performed cable installation and tensioning on site. This paper addresses the advantages of using HDPE sheathing with respect to cables durability, as well as the entire process of installation and tensioning of stay cables and all related challenges.

Keywords:
cable-stayed bridge HDPE Full Lock Coil cables Vibration method