Lagen Bridge Cables Installation and Tensioning
|
Bibliographic Details
Author(s): |
Silvia Geyer
(Project Manager Redaelli Tecna Milan, Italy)
Daniela Lombardini (Division Manager Redaelli Tecna Milan, Italy) Claudio Pin (Project Manager Redaelli Tecna Milan, Italy) |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Congress: Challenges in Design and Construction of an Innovative and Sustainable Built Environment, Stockholm, Sweden, 21-23 September 2016 | ||||
Published in: | IABSE Congress Stockholm, 2016 | ||||
|
|||||
Page(s): | 2608-2614 | ||||
Total no. of pages: | 7 | ||||
Year: | 2016 | ||||
DOI: | 10.2749/stockholm.2016.2607 | ||||
Abstract: |
The Lagen Bridge is the first application of prefabricated HDPE sheathed full locked coil cable stays on a Norwegian bridge. The structure is located in Kvam, about 100 km North from Lillehammer, and it is part of the development project of route E6 between Biri and Otta. Redaelli supplied the complete set of stay cables and performed cable installation and tensioning on site. This paper addresses the advantages of using HDPE sheathing with respect to cables durability, as well as the entire process of installation and tensioning of stay cables and all related challenges. |
||||
Keywords: |
cable-stayed bridge HDPE Full Lock Coil cables Vibration method
|