0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Knowledge Management for Construction Scheduling

Author(s):



Medium: conference paper
Language(s): English
Conference: IABSE Conference: Information and Communication Technology (ICT) for Bridges, Buildings and Construction Practice, Helsinki, Finland, June 2008
Published in:
Page(s): 22-29
Year: 2008
DOI: 10.2749/222137808796106161
  • About this
    data sheet
  • Reference-ID
    10296365
  • Published on:
    06/02/2019
  • Last updated on:
    29/03/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine