0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Interdisciplinary interaction analysis at the realisation process of an exemplary retractable structure in Doha

 Interdisciplinary interaction analysis at the realisation process of an exemplary retractable structure in Doha
Author(s): , , , ,
Presented at IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017, published in , pp. 212-219
DOI: 10.2749/222137817821232324
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.1 MB

The design process of retractable membrane structures is characterised by strong interactions between the different specialists and suppliers. Tracing back problems in the overall design and build ...
Read more

Bibliographic Details

Author(s): (PFEIFER Seil- und Hebetechnik GmbH, Memmingen, Germany; Technische Universität München, Chair of Structural Design Prof. Dr.-Ing Prof. R. Barthel, Germany)
(PFEIFER Seil- und Hebetechnik GmbH, Memmingen, Germany)
(PFEIFER Seil- und Hebetechnik GmbH, Memmingen, Germany)
(PFEIFER Covertex, Shanghai, China)
(PFEIFER Systems GmbH, Satteins, Austria)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Creativity and Collaboration – Instilling Imagination and Innovation in Structural Design, Bath, United Kingdom, 19-20 April 2017
Published in:
Page(s): 212-219 Total no. of pages: 8
Page(s): 212-219
Total no. of pages: 8
Year: 2017
DOI: 10.2749/222137817821232324
Abstract:

The design process of retractable membrane structures is characterised by strong interactions between the different specialists and suppliers. Tracing back problems in the overall design and build process of these kinds of structures, not or late recognised interactions in the design process of different planning domains can be identified as the cause. For the correspondent involved planners and suppliers dependencies results in design loops and recesses and very often problems with the schedule. The aim of the article is to describe appropriate concepts for an early detection and analysis of indirect and non-obvious dependencies to overcome the above-mentioned problems.

Keywords:
membrane structures lightweight structures cable structure Interactions graph theory moveable structure dependencies