0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Integral Construction for Elevated Road over Barapullah Nalla from Sarai Kale Khan to Jawahar Lal Nehru Stadium

 Integral Construction for Elevated Road over Barapullah Nalla from Sarai Kale Khan to Jawahar Lal Nehru Stadium
Author(s): , ,
Presented at IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013, published in , pp. 1-8
DOI: 10.2749/222137813808627730
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.06 MB

For Commonwealth Games-2010 held in Delhi, Barapulla Elevated road was conceived as an arterial route to provide seamless connectivity from games village to Venue. This project was completed within...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Long Span Bridges and Roofs - Development, Design and Implementation, Kolkata, India, 24-27 September 2013
Published in:
Page(s): 1-8 Total no. of pages: 8
Page(s): 1-8
Total no. of pages: 8
Year: 2013
DOI: 10.2749/222137813808627730
Abstract:

For Commonwealth Games-2010 held in Delhi, Barapulla Elevated road was conceived as an arterial route to provide seamless connectivity from games village to Venue. This project was completed within very tight time constraint. The construction involved integral structures at entry to the entry road as well as major road/railway crossings. Present paper details the various aspects of the project including the design innovations which resulted in construction to be completed within time.

Keywords:
Balanced cantilever construction precast segmental construction integral structures Barapulla elevated road Cast-in-situ voided slab Crossings over major road/ railways tracks