Gibraltar Straits crossing: a new design proposal
|
Bibliographic Details
Author(s): |
Marco Peroni
|
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007 | ||||
Published in: | IABSE Symposium Weimar 2007 | ||||
|
|||||
Page(s): | 532-533 | ||||
Total no. of pages: | 8 | ||||
Year: | 2007 | ||||
DOI: | 10.2749/weimar.2007.0132 | ||||
Abstract: |
At the start of a new millennium, the plan to permanently bridge the historic gap of the Gibraltar Strait has begun research design to create the most state of the art crossing the planet has never known. My Gibraltar Strait crossing proposal consist in a suspended bridge that connects the 15Km of the Straits with a “ultra–long” central span of 10Km, based on a new type of suspended structure. |
||||
Keywords: |
Gibraltar Straits ultra long spans bridge hyperboloid at one sheet net ropes
|