The first in the world! Continuous belt conveyor mucking system at a tunnel excavated by blasting
Tagami tunnel of Kyushu Shinkansen
Author(s): |
Yukio Yoshitomi
|
---|---|
Medium: | conference paper |
Language(s): | French |
Conference: | AFTES – Paris 25-28 octobre 1999 |
Published in: | Les travaux en souterrain: ambitions et réalités. Underground works: ambitions and reality |
Page(s): | 323-330 |
Year: | 1999 |