0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Erecting analysis of cable-stayed bridges by substructure procedures

 Erecting analysis of cable-stayed bridges by substructure procedures
Author(s): ,
Presented at IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, published in , pp. 588-589
DOI: 10.2749/weimar.2007.0566
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.7 MB

The erecting analysis of cable-stayed bridges involves repeatedly modeling to sequential structural systems, in which substructure procedures is accomplished. A single tower cable-stayed bridge of ...
Read more

Bibliographic Details

Author(s):

Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Published in:
Page(s): 588-589 Total no. of pages: 4
Page(s): 588-589
Total no. of pages: 4
Year: 2007
DOI: 10.2749/weimar.2007.0566
Abstract:

The erecting analysis of cable-stayed bridges involves repeatedly modeling to sequential structural systems, in which substructure procedures is accomplished. A single tower cable-stayed bridge of rigid connection between girder, tower and pier is used as an example to illustrate the rules of substructure division and to perform the analysis of erecting stages. The erecting stages are simulated by 30 super-elements of successive mode. The calculating results show that the time consumption of substructure procedures is just one seventh of that by ordinary method with the comparative accuracy of both methods not exceeding 5%. Thereby, it is confirmed that substructure procedures are applicable to the erecting analysis of cable-stayed bridges with obvious advantages.

Keywords:
cable-stayed bridges substructures super-elements erecting analysis construction simulation

Structure Types