• DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

EPB shields in non-cohesive terrains with a water load: recent achievements on Tunnel section of Line 1 of Seville Metro

Author(s):


Medium: conference paper
Language(s): en 
Conference: AFTES - Journées techniques, Monaco, 2008
Published in:
Page(s): 327-334
Year: 2008

Structures and Projects

Advertisement

  • About this
    data sheet
  • Reference-ID
    10057241
  • Published on:
    31/10/2010
  • Last updated on:
    05/03/2019