Design of the Tsakona Arched Bridge
|
Bibliographic Details
Author(s): |
Kyriakos Stathopoulos
Savvas Vlachos Pavlos Thanopoulos Ioannis Spyropoulos Panagiotis Kotsanopoulos Stamatios Stathopoulos |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014 | ||||
Published in: | IABSE Symposium Madrid 2014 | ||||
|
|||||
Page(s): | 2179-2186 | ||||
Total no. of pages: | 8 | ||||
Year: | 2014 | ||||
DOI: | 10.2749/222137814814069516 | ||||
Abstract: |
An extended landslide cut the National Road Corinthos-Tripoli-Kalamata in Southern Greece and emerged the need for the construction of a large singular structure, capable to bridge the whole landslide in an area of high seismicity. In order to address the challenge, a bridge with length of 390m was designed. The main span 300m long, which passes over the landslide, consists of two vertical steel arches with rise of 45m and a steel-concrete composite deck, 22,80m wide, fully suspended by the arches with 2x20 vertical hangers. The approach to the main span of the bridge is achieved by a V-shaped prestressed concrete bridge 90m long and 20,40m wide. |
||||
Keywords: |
steel design concrete bridge seismic isolation composite prestress construction arch full locked coil ropes
|