0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Design of segmental box girder bridges with match cast dry joints in Melbourne, Australia

 Design of segmental box girder bridges with match cast dry joints in Melbourne, Australia
Author(s): , ,
Presented at IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, published in , pp. 269-275
DOI: 10.2749/christchurch.2021.0269
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.21 MB

A study of recent work undertaken on the Caulfield to Dandenong Level Crossing Removal Project and West Gate Tunnel Project in Melbourne Australia. The viaducts on these projects were precast segme...
Read more

Bibliographic Details

Author(s): (Technical Director, Aurecon, Melbourne, Australia)
(Associate, Aurecon, Melbourne, Australia)
(Principal Structural Engineer, Jacobs, Melbourne, Australia)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Published in:
Page(s): 269-275 Total no. of pages: 7
Page(s): 269-275
Total no. of pages: 7
DOI: 10.2749/christchurch.2021.0269
Abstract:

A study of recent work undertaken on the Caulfield to Dandenong Level Crossing Removal Project and West Gate Tunnel Project in Melbourne Australia. The viaducts on these projects were precast segmental box girders erected span-by-span with match cast dry joints which present several key advantages in brownfield construction of linear infrastructure.

These case studies consider the application of Australian and International design standards to the design of Australian Infrastructure. It is acknowledged that international design standards such as AASHTO have moved away from the use of match cast dry joints however in the Australian context they are still relevant, and it has been necessary to interrogate current standards to establish a suitable design basis. This approach is imperative when assessing existing infrastructure like recent work on the West Gate Tunnel Project which involved the assessment of the existing precast segmental City Link Viaducts. This study seeks to present recommendations on how AS5100.5 may be modified to provide a more practical and efficient solution for the design of new and the assessment of existing infrastructure.

Keywords:
precast segmental box girders Match Cast Dry Joints

Geographic Locations