Design and Construction of Ishin Memorial Park Athletic Stadium

Manufacture of the Stadium Roof

Author(s):






Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

This is a report on the erection process analysis, the prefabrication, and the erection of the steel frame of the large roof of the main stand of Ishin Memorial Park Athletic Stadium.

Before the start of factory-fabrication and erection, the erection process analysis was conducted. The analytical results were reflected on factory-fabrication and erection methods and accuracy control during erection. Complex interfaces were studied by three-dimensional CAD to check to see whether members could be fabricated, joined by welding, and assembled properly.

For the erection, an erection plan is determined based on the results of the erection process analysis, and accuracy control is conducted carefully.

We will report on the erection process analysis, the erection work and the result of the erection work about this structure.

Keywords:
cable suspension structure erection process analysis three-dimensional CAD temporary-tower axial force control

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065491
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine