Design and construction of a cable-stayed bridge with mixed structure
Author(s): |
J. Tajima
M. Ohashi K. Tada |
---|---|
Medium: | conference paper |
Language(s): | English |
Conference: | IABSE Symposium: Mixed Structures, including New Materials = Construction mixte acier, béton et nouveaux matériaux = Misch- und Verbundbauweisen einschliesslich neuer Baustoffe, Brussels, Belgium, 1990 |
Published in: | Mixed Structures, including New Materials = Construction mixte acier, béton et nouveaux matériaux = Misch- und Verbundbauweisen einschliesslich neuer Baustoffe |
Year: | 1990 |
DOI: | 10.5169/seals-46505 |
Abstract: | Ikuchi Bridge is a cable-stayed bridge with a 490 m main span. The main girder of this bridge is a steel concrete mixed structure consisting of a steel girder for the center span, and prestressed concrete girders for both side spans. The connected parts between them were designed by taking account of the transmission mechanism of the stress, steel fabrication, actual construction methods etc. This report deals mainly with the design and construction of the connected parts between two types of girders. |
Structures and Projects
- About this
data sheet - Reference-ID
10543945 - Published on:
13/01/2021 - Last updated on:
19/02/2021