0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Déplacements verticaux liés au creusement au tunnelier à pression de terre (EPBM)

Cas du métro de Lille – ligne 2: lots 1 et 3

Author(s):


Medium: conference paper
Language(s): French
Conference: AFTES - Journées d'études, Chambéry, 1996
Published in:
Page(s): 483-488
Year: 1996

Structures and Projects

Geographic Locations

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10016760
  • Published on:
    16/01/2005
  • Last updated on:
    05/03/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine