0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Demolishment of a post-tensioned concrete viaduct across a motorway in Almere, The Netherlands

 Demolishment of a post-tensioned concrete viaduct across a motorway in Almere, The Netherlands
Author(s): , ,
Presented at IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, published in , pp. 1248-1254
DOI: 10.2749/222137815818358501
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.07 MB

In Western Europe there are many concrete bridges and viaducts which were built 35 years or more ago. Although most of these concrete structures can be maintained, some structures become functional...
Read more

Bibliographic Details

Author(s): (Royal HaskoningDHV, the Netherlands)
(Royal HaskoningDHV, the Netherlands)
(SAAone, the Netherlands)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Published in:
Page(s): 1248-1254 Total no. of pages: 7
Page(s): 1248-1254
Total no. of pages: 7
Year: 2015
DOI: 10.2749/222137815818358501
Abstract:

In Western Europe there are many concrete bridges and viaducts which were built 35 years or more ago. Although most of these concrete structures can be maintained, some structures become functionally obsolete. Because of the strongly increased traffic between Amsterdam and Almere, the Motorway A1 and A6 will be widened in the next years. Overpass “Havendreef” spans motorway A6 and is one of the structures which need to be replaced in order to realise the wider motorway underneath. This two span viaduct consists of a post-tensioned concrete slab with a varying construction depth.

Many difficulties were encountered in this project from an engineering point of view. How to deal with a lack of structural information? What is the structural behaviour of the post-tensioned cables after cutting? Which part could structurally be demolished in the first phase and which in the second?

Because the penalties for traffic hindrance due to construction are strict, the overpass had to be demolished as fast as possible, whilst underneath one span the traffic flow was undisturbed.

Keywords:
viaduct concrete execution post-tensioning engineering demolish

Structure Types

Geographic Locations