Construction Sequence Simulation for Partial Cable Stayed Truss Bridge with Single Pylon

 Construction Sequence Simulation for Partial Cable Stayed Truss Bridge with Single Pylon
Author(s): , , ,
Presented at IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, published in , pp. 115-122
DOI: 10.2749/222137814814027503
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.17 MB

Qiansimen Bridge, a part of Liangjiang Bridge in Chongqing city in China, is currently under construction by the Chinese contractor CCCC, Second Harbor Engineering Company Ltd. The bridge has been...
Read more

Bibliographic Details

Author(s):



Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Published in:
Page(s): 115-122 Total no. of pages: 8
Page(s): 115-122
Total no. of pages: 8
Year: 2014
DOI: 10.2749/222137814814027503
Abstract:

Qiansimen Bridge, a part of Liangjiang Bridge in Chongqing city in China, is currently under construction by the Chinese contractor CCCC, Second Harbor Engineering Company Ltd. The bridge has been designed by T.Y. Lin International (China) as partially cable stayed bridge with steel truss girders and a single reinforced concrete pylon. The opening of the bridge is planned for July 2014. Each steel truss segment has a length of 16 m and forms an extremely heavy element of the bridge, which cannot be fabricated and erected in one piece. Stay cable forces vary between 10 000 and 15 000 kN during erection phase and in final state. Proper layout and adjustment of cable forces throughout the construction schedule is usually a tedious process. This paper presents an ingenious numerical simulation of the bridge construction sequence, where the erection process is accurately followed up by appropriate techniques. Result of the simulation is an optimized construction sequence of the steel truss, which on the one hand leads to a reasonable stress distribution in the truss elements and on the other hand allows for saving construction costs by avoiding multiple adjustments of stay cable forces during the construction process.

Keywords:
numerical simulation cable force steel truss Construction sequence partially cable stayed bridge single pylon