0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction Optimisation of RAO II Bridge

Author(s):

Medium: conference paper
Language(s): English
Conference: 35th Annual Symposium of IABSE / 52nd Annual Symposium of IASS / 6th International Conference on Space Structures: Taller, Longer, Lighter - Meeting growing demand with limited resources, London, United Kingdom, September 2011
Published in:
Year: 2011
Abstract:

This paper addresses the process of modelling, analysis and structural optimization of the Rao II cable stayed bridge. The Rao II Bridge includes the typical challenges for an engineer when optimizing and simulating the construction of a cable stayed bridge with a composite deck. Some of these challenges are the optimisation of stress free lengths of stay cables, cracked concrete over supports and optimizing the overall structure and construction sequence.

Keywords:
cable-stayed bridge modeling optimization numerical analysis Construction sequence linear analysis fabrication shape cracked concrete Erection Control free cable lengths

Structures and Projects

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10065409
  • Published on:
    03/10/2011
  • Last updated on:
    05/07/2021
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine