0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction of sewer tunnel main crossing under a river bed with shallow overburden using pressurized Slurry-Faced Shield

Author(s):


Medium: conference paper
Language(s): English
Conference: AFTES - Journées techniques, Lyon, 27-29 novembre, 1984
Published in:
Page(s): 61-68
Year: 1984

Structure Types

Structurae cannot make the full text of this publication available at this time.
  • About this
    data sheet
  • Reference-ID
    10056889
  • Published on:
    31/10/2010
  • Last updated on:
    05/03/2019
 
Structurae cooperates with
International Association for Bridge and Structural Engineering (IABSE)
e-mosty Magazine
e-BrIM Magazine