0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction monitoring and control for Jiaomen River arch bridge in Guangzhou

 Construction monitoring and control for Jiaomen River arch bridge in Guangzhou
Author(s): , , ,
Presented at IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017, published in , pp. 2675-2682
DOI: 10.2749/vancouver.2017.2675
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.2 MB

For novel arch rib, it is difficult to control the accuracy of the segments and whole bridge, especially for special shape bridge. It is also hard to balance the maximum lateral displacement (MLD) ...
Read more

Bibliographic Details

Author(s): (South China University of Technology, Guangzhou, Guangdong, China)
(South China University of Technology, Guangzhou, Guangdong, China)
(South China University of Technology, Guangzhou, Guangdong, China)
(South China University of Technology, Guangzhou, Guangdong, China)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017
Published in:
Page(s): 2675-2682 Total no. of pages: 8
Page(s): 2675-2682
Total no. of pages: 8
Year: 2017
DOI: 10.2749/vancouver.2017.2675
Abstract:

For novel arch rib, it is difficult to control the accuracy of the segments and whole bridge, especially for special shape bridge. It is also hard to balance the maximum lateral displacement (MLD) of arch rib and the maximum axis force (MAF) of jigs when removing temporary supports at high altitude. To address these issues, firstly, the derrick arch bridge with a total span of 231 meters is taken as the research object. Following the establishment of the finite element (FE) model of the bridge, an innovative criterion is proposed to consider both axis position and inclination angle, in which the error during the closure stage of the bridge is controlled availably. Secondly, among three potential plans modeled with FE model, one was chosen to remove the jigs, which effectively reducing the MAF and the MLD. Finally, the field monitor tests were proofread with FE model results to ensure the reasonable state of the bridge.

Keywords:
monitoring novel arch unsymmetrical extroversive orientation assembling jig removed

Geographic Locations