0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Construction and Testing of a CFRP-prestressed Railway Bridge Prototype

 Construction and Testing of a CFRP-prestressed Railway Bridge Prototype
Author(s): , ,
Presented at IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024, published in , pp. 90-98
DOI: 10.2749/manchester.2024.0090
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.09 MB

This paper presents a new single-span railway bridge system, currently under development by the authors in cooperation with the Swiss Federal Railways and further partners, combining high- performa...
Read more

Bibliographic Details

Author(s): (ETH Zurich, Switzerland)
(ETH Zurich, Switzerland)
(ETH Zurich, Switzerland)
Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Construction’s Role for a World in Emergency, Manchester, United Kingdom, 10-14 April 2024
Published in:
Page(s): 90-98 Total no. of pages: 9
Page(s): 90-98
Total no. of pages: 9
DOI: 10.2749/manchester.2024.0090
Abstract:

This paper presents a new single-span railway bridge system, currently under development by the authors in cooperation with the Swiss Federal Railways and further partners, combining high- performance concrete, stainless reinforcing steel and CFRP prestressing for maximum durability. A significant milestone in the project was the successful construction and testing of a 6,5 x 1,7 m2 prototype consisting of four pretensioned longitudinal girders; each prestressed with 12 Ø8,2 mm sand-coated CFRP rods. The paper discusses selected aspects of the sustainability of the novel material combination and the construction of the prototype. Furthermore, the structural behaviour of the prototype is analysed, focusing on its response under shear forces.

Keywords:
sustainability stainless steel bridge engineering precasting pretensioning CFRP-prestressing