0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Concrete Gravity Dams: Coupled Thermal-Stress Numerical Analysis

 Concrete Gravity Dams: Coupled Thermal-Stress Numerical Analysis
Author(s): , ,
Presented at IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014, published in , pp. 467-474
DOI: 10.2749/222137814814028052
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.17 MB

During the process of setting-out and hardening in concrete, the temperature profile shows a gradual nonlinear distribution due to the development of heat of hydration of cement. At early ages of ...
Read more

Bibliographic Details

Author(s):


Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Engineering for Progress, Nature and People, Madrid, Spain, 3-5 September 2014
Published in:
Page(s): 467-474 Total no. of pages: 8
Page(s): 467-474
Total no. of pages: 8
Year: 2014
DOI: 10.2749/222137814814028052
Abstract:

During the process of setting-out and hardening in concrete, the temperature profile shows a gradual nonlinear distribution due to the development of heat of hydration of cement. At early ages of concrete structures, this non-linear distribution can have an influence on crack evolution, especially in mass concrete such as that used in concrete gravity dams. It is thus important to study the factors affecting the amount of heat generated in the hydration process and minimize it as much as possible in order to prevent the generation of undesired cracks through the dam’s body. Coupled thermal- stress finite element analysis has been performed on a full-scale concrete gravity dam to determine the impact of changing the time intervals in concrete placing schedule on the thermal/stress response of the dam. The significance of time, material and environmental factors has been scrutinized in this numerical investigation. The investigated parameters are the construction schedule of casting concrete, the cement content and the ambient temperature. The investigation also numerically explored the effect of water pipe cooling of mass concrete on the generated temperature and induced stress in concrete which ends up with recommending the most effective strategy for pipe cooling.

Keywords:
construction schedule adiabatic temperature gravity dams hydration heat pipe cooling tensile stresses

Structure Types