0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

Collapse process analysis in construction of concrete-filled steel tube arch bridge

 Collapse process analysis in construction of concrete-filled steel tube arch bridge
Author(s): , , , ,
Presented at IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007, published in , pp. 330-331
DOI: 10.2749/222137807796158183
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.66 MB

This paper gives a detail introduction of collapse simulation of some critical construction stages of Taiping Lake Bridge, which is a CFST arch bridge with main span of 336m in Anhui Province, Chin...
Read more

Bibliographic Details

Author(s):




Medium: conference paper
Language(s): English
Conference: IABSE Symposium: Improving Infrastructure Worldwide, Weimar, Germany, 19-21 September 2007
Published in:
Page(s): 330-331 Total no. of pages: 8
Page(s): 330-331
Total no. of pages: 8
Year: 2007
DOI: 10.2749/222137807796158183
Abstract:

This paper gives a detail introduction of collapse simulation of some critical construction stages of Taiping Lake Bridge, which is a CFST arch bridge with main span of 336m in Anhui Province, China. Arch ribs are erected by temporary cables-stayed system with cantilever construction method. During construction of this bridge, in every one of the 23 working stages the collapse simulation was carried out with FEM method. According to the results the structure system of Taiping Lake Bridge in construction is strong enough. Here gives examples on two key stages.

Keywords:
construction stage concrete-filled steel tube collapse simulation