Challenges in the Evaluation of Existing Concrete Structures: Margaret Avenue Bridge

 Challenges in the Evaluation of Existing Concrete Structures: Margaret Avenue Bridge
Author(s): , ,
Presented at IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015, published in , pp. 1187-1194
DOI: 10.2749/222137815818358466
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.09 MB

The De la Concorde Overpass in Laval, Quebec, Canada failed in 2006 and cost the lives of five people. The failure initiated in the half-joint of the thick cantilever slab that supported the drop-i...
Read more

Bibliographic Details

Author(s): (Associated Engineering, Burnaby, BC, Canada (formerly with AECOM, Edmonton, AB, Canada))
(AECOM, Kitchener, ON, Canada)
(City of Kitchener, Kitchener, ON, Canada)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Structural Engineering: Providing Solutions to Global Challenges, Geneva, Switzerland, September 2015
Published in:
Page(s): 1187-1194 Total no. of pages: 8
Page(s): 1187-1194
Total no. of pages: 8
Year: 2015
DOI: 10.2749/222137815818358466
Abstract:

The De la Concorde Overpass in Laval, Quebec, Canada failed in 2006 and cost the lives of five people. The failure initiated in the half-joint of the thick cantilever slab that supported the drop-in span. Following this failure, a number of owners across Canada evaluated non-redundant half-joint connections of concrete bridges, including the Margaret Avenue Bridge in Kitchener, Ontario, Canada. This paper describes the evaluation of the half-joint detail of the structure including review of existing information and a discussion of uncertainties that led to the closure and demolition of the structure. The paper critically compares observations during the demolition of the structure with the assumptions made during the evaluation. The findings during demolition confirmed the majority of the assumptions and validated the decision to demolish the structure.

Keywords:
bridge reinforced-concrete half-joint load evaluation