0
  • DE
  • EN
  • FR
  • International Database and Gallery of Structures

Advertisement

The caulfield to Dandenong Level Crossing Removal Project – An innovative, sustainable, congestion busting success.

The caulfield to Dandenong Level Crossing Removal Project – An innovative, sustainable, congestion busting success.
Author(s): ,
Presented at IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021, published in , pp. 1032-1039
DOI: 10.2749/christchurch.2021.1032
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.2 MB

A case study of the Caulfield to Dandenong Level Crossing Removal Project in Melbourne Australia focusing on Design and Sustainability outcomes in urban infrastructure congestion. The Project compl...
Read more

Bibliographic Details

Author(s): (Aurecon, Melbourne, Australia)
(Aurecon, Melbourne, Australia)
Medium: conference paper
Language(s): English
Conference: IABSE Congress: Resilient technologies for sustainable infrastructure, Christchurch, New Zealand, 3-5 February 2021
Published in:
Page(s): 1032-1039 Total no. of pages: 8
Page(s): 1032-1039
Total no. of pages: 8
DOI: 10.2749/christchurch.2021.1032
Abstract:

A case study of the Caulfield to Dandenong Level Crossing Removal Project in Melbourne Australia focusing on Design and Sustainability outcomes in urban infrastructure congestion. The Project completed in 2018 increased corridor capacity by 42% on Melbourne’s busiest rail corridor whilst removing nine level crossings and building five new stations. The Project has achieved an Excellent Rating with Infrastructure Sustainability Council Australia on the back of several key initiatives, not least being the bold decision to adopt an innovative elevated span by span design and construction solution for the critical 6 km of rail viaducts that kept the rail corridor open without any long-term rail closures. The completed Project now sets a new standard in urban design integration in form of structure and urban renewal, activation and re-use of the rail corridor at ground level.

Keywords:
span by span Level Crossing Removal rail viaduct segmental match cast