Cable Replacement of the Tacitus Cable Stayed Bridge

 Cable Replacement of the Tacitus Cable Stayed Bridge
Author(s): , ,
Presented at IABSE Conference: Engineering the Past, to Meet the Needs of the Future, Copenhagen, Denmark, 25-27 June 2018, published in , pp. 172-179
DOI: 10.2749/copenhagen.2018.172
Price: € 25.00 incl. VAT for PDF document  
ADD TO CART
Download preview file (PDF) 0.17 MB
As part of a major renovation programme of critical highway infrastructure in the Netherlands, the Tacitus Bridge at Ewijk, a 1055-metre-long orthotropic steel box girder deck of ten spans, with a m...
Read more

Bibliographic Details

Author(s): (Arup, Amsterdam, the Netherlands)
(Arup, Amsterdam, the Netherlands)
(Arup, Amsterdam, the Netherlands)
Medium: conference paper
Language(s): English
Conference: IABSE Conference: Engineering the Past, to Meet the Needs of the Future, Copenhagen, Denmark, 25-27 June 2018
Published in:
Page(s): 172-179 Total no. of pages: 8
Page(s): 172-179
Total no. of pages: 8
DOI: 10.2749/copenhagen.2018.172
Abstract: As part of a major renovation programme of critical highway infrastructure in the Netherlands, the Tacitus Bridge at Ewijk, a 1055-metre-long orthotropic steel box girder deck of ten spans, with a main cable-stayed span of 270 metres, has undergone extensive strengthening and refurbishment. Due to the presence of micro-fissure defects identified in the existing lock coiled stay cables and an increase in permanent load on the bridge deck resulting from the addition of a high strength concrete overlay acting compositely with the orthotropic steel deck, it was concluded that the existing stay cables needed replacement. This paper presents the analytical approach developed to verify that the existing stay cables could be removed with no additional temporary supports and the use of advanced non-linear techniques to predict and monitor the performance of the bridge during each step of destressing the existing stay cables and of tensioning the new parallel strand cables.
Keywords:
non-linear analysis Stay cable replacement steel orthotropic box girder