Cable Erection of Triple Pylons (multi-span) Suspension bridge, New Millennium Bridge
|
Bibliographic Details
Author(s): |
Kyuyoung Yang
(Daelim Industrial, Seoul, Republic of Korea)
Jungin Kim (Daelim Industrial, Seoul, Republic of Korea) Jinhyuk Choi (Daelim Industrial, Seoul, Republic of Korea) Taekwun Park (Daelim Industrial, Seoul, Republic of Korea) Jaehong Kim (Daelim Industrial, Seoul, Republic of Korea) |
||||
---|---|---|---|---|---|
Medium: | conference paper | ||||
Language(s): | English | ||||
Conference: | IABSE Symposium: Engineering the Future, Vancouver, Canada, 21-23 September 2017 | ||||
Published in: | IABSE Symposium Vancouver 2017 | ||||
|
|||||
Page(s): | 972-977 | ||||
Total no. of pages: | 6 | ||||
Year: | 2017 | ||||
DOI: | 10.2749/vancouver.2017.0972 | ||||
Abstract: |
The triple pylons suspension bridge in Korea, New Millennium Bridge, has triple pylons and multi- span. For the erection of main cables with 21 strands and 2,667 wires, the Prefabricated Parallel Wire Strand (PPWS) method has been adapted, and the cable erection work will be conducted from June to August in 2017. The paper describes the installation and design of catwalk and pylon saddle and erection of main cable of New Millennium Bridge. |
||||
Keywords: |
cable erection Multi-span suspension bridge PPWS method triple pylons catwalk system pylon saddle
|